MyPsychSim Logo
MyPsychSim
Back to Scenarios
Systems Thinking

The Delay Dilemma: Causal Loops and Time Lags in the Supply Chain

A manufacturer can't stop the boom-and-bust cycle in its warehouses. The cause is hidden in plain sight, tangled in time.

Duration

50 min

Difficulty

Advanced

Stakeholders

5

Company Size

Large (500-5000)

Organizational Background

Cascade Components Manufacturing produces industrial valves and fittings, managing a multi-tier supply chain with raw material suppliers, in-house production, warehousing, and distribution to industrial buyers. The company has struggled for years with inventory oscillation: stockouts followed by overstock, in waves that seem to amplify rather than settle. The root cause is delayed feedback. When a stockout occurs, the signal to order more travels through multiple stages-each with its own delay: order processing (days), supplier lead time (weeks), production scheduling (weeks), and transit (days). By the time inventory arrives, demand has shifted, and the order-placed based on outdated information-either overshoots or undershoots. This creates a classic oscillation pattern where the system overcorrects because the feedback it acts on is always stale. Cascade is an open system: demand arrives from the environment and cannot be perfectly predicted. Internally, the supply chain is a network of coupled loops with delays at each stage. The delays transform what would be stable balancing loops (order when low, stop when high) into oscillating ones, because the corrective action arrives out of phase with the condition that triggered it. The VP of Operations has engaged a systems thinking consultant to help the team map the causal loops, identify where delays are most destabilizing, and design interventions that account for-rather than ignore-the system's delayed feedback structure.

Key Stakeholders

Learning Objectives

  • Construct a causal loop diagram of the supply chain showing ordering, production, and inventory loops with delay notations
  • Explain how delays in feedback loops transform stable balancing loops into oscillating ones
  • Analyze how delayed feedback causes overcorrection and amplification of demand variability (the bullwhip effect)
  • Identify leverage points for reducing destabilizing delays versus accepting and designing around them
  • Apply open systems theory to understand how external demand uncertainty interacts with internal delay structure

Sign Up to Access This Scenario

Create a free account and get one free simulation to try PsychSim.

Host a Team Session

Click Host Team Simulation to create a session and receive a 6-character join code. Share the code with your teammates so they can join via Join Existing Session. At the end, a structured group debrief guide is generated for the team.

Instructor Monitoring

Instructors and admins have access to the Instructor Monitor in the sidebar. From there, you can view all live sessions, see the full conversation feed, send real-time notes to students, advance phases, and end sessions. To enable instructor access, an admin must set your account role to "instructor" in the User management section of the platform dashboard.

© 2026 MyPsychSim. All rights reserved. The PsychSim platform, including all scenarios, simulations, instructional content, assessments, and AI-generated feedback, are proprietary intellectual property of PsychSim and protected under applicable copyright and trademark laws. Unauthorized reproduction, distribution, modification, or use of this content is prohibited without express written permission.